Halliburton Manufacturing Plant and Campus

Photo Credit: Obayashi Corporation

The Completion Tools Manufacturing Plant and Technology Campus is Halliburton’s third manufacturing complex in Singapore which houses testing components and a five-storey administration centre. It plays host to a range of services and equipment, including subsurface safety valves and flow control equipment, surface safety systems, packers, specialty completion equipment, expandable liner hanger systems, swellable technology, intelligent completion systems, sand control systems and screens, well servicing tools, and reservoir performance services.

The Technology Campus is an addition to the Completion Tools Manufacturing Plant and consists of a two-storey administration building, a single-storey engineering building and three other ancillary testing facilities. The buildings are orientated almost north-south and all, with the exception of the administration building, are well-insulated and sealed with less glazing on the west façade.

Among the campus testing facilities is a 9,000ft-deep test well that performs tests for equipment, tools and running procedures in a simulated environment representing real well conditions.

AT A GLANCE

Area

67,353.7 m2

Location

Singapore

Completion

2012 (manufacturing plant), 2014 (technology campus)

Services

Architecture, Civil & Structural Engineering, Mechanical & Electrical Engineering

Owner(s)

Halliburton Completion Tools Manufacturing Pte. Ltd. and Halliburton Far East Pte. Ltd.

In Collaboration with

Gensler Houston

AWARDS

2016
BCA Design & Engineering Safety Excellence Awards – Merit

2015
BCA Green Mark Awards – Platinum

2014
BCA Construction Excellence Awards

2013
BCA Green Mark Awards – Gold

GALLERY

RELATED PROJECTS

Pacific Integrated Logistics Ramp-Up Warehouse

Evonik

Wusong Industrial Estate Master Plan & Urban Design

Halliburton Manufacturing Plant and Campus

Guangzhou Knowledge City

XILINX