The iconic Changi Airport Terminal 4 is one completed with ingenious engineering processes and solutions. Faced with the challenge of having to complete the main terminal building in 30 months, productivity was key. To address this, most of the structure were prefabricated offsite, then transported and assembled onsite. The adoption of a full precast system approach for the second storey of the terminal building reduced the construction time by 64% compared to the conventional in-situ method.

The unique “Hat First” construction method was adopted for the terminal building. The roof was completed ahead of the floors below from the middle out. This provided a safe and conducive working environment for early commencement of finishing and services works as well as early installation of the airport’s Baggage Handling System.

To achieve a visually appealing, column-free hall, another engineering feat was the use of long steel roof trusses to support the roof of terminal departure hall.

AT A GLANCE

Gross Floor Area

227,300 m2

Location

Singapore

Completion

2017

Services

Civil & Structural Engineering

Owner(s)

Changi Airport Group (Singapore) Pte Ltd

AWARDS

2019
BCI Asia Interior Design Awards – Winner
BCA Construction Productivity Awards – Platinum
BCA Construction Excellence Awards – Excellence

2018
SSSS Structural Steel Excellence Awards – Trophy
Singapore Good Design Mark Award – Platinum
President’s Design Award – Design of the Year
BCA Universal Design Mark Award – Platinum
BCA Design & Engineering Safety Excellence Award – Excellence

2015
BCA UD Mark Award – Gold Plus (Design)
BCA Green Mark Award – Gold Plus

GALLERY

RELATED PROJECTS

Difengjiang District Urban Design

Changchun North-East Asia Smart Innovative Model District

Resorts World Sentosa Expansion

Canberra Station

Jewel Changi Airport

Deira Mall

8 Conlay

Nakheel Mall and Palm Tower